Concrete Flatwork RFP 4-25-17

 

Community Development

REQUEST FOR PROPOSAL

 Concrete Flatwork RFP 4-25-17

OWNER:        MILLE LACS BAND OF OJIBWE                        DATE ISSUED:  25 April 2017

                      43408 OODENA DRIVE

                      ONAMIA, MN 56359                                           BID DATE:         17 May 2017

 

PROJECT:      D2 Pow Wow Concrete: 37736 Hwy. 65, McGregor, MN

                                                                         

TO:          QUALIFIED GENERAL CONTRACTORS

                                                             

THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.                                                                                                     

 

The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for concrete flatwork installation at the D2 Pow Wow Grounds in McGregor, MN.   Bids will be due Wednesday 17 May, 2017 at 3:00 PM.  Bids received will be opened and qualified by the Mille Lacs Band of Ojibwe on Thursday 18 May, 2017 at 8:30 AM.

 

A mandatory Pre-Bid site visit will be held at the site on Wednesday 5/10/17 at 1:30 PM.

 

 

General Notes:

  1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book.
  2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property.
  3. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference.
  4. Contractor will secure all permits and fees.
  5. Contractor is responsible for a thorough investigation of the scope of work.
  6. Contractor will repair any damage to the property or structure created by the scope of work.
  7. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL.

 

 

 

 

 

 

 

Work Scope Description:

 

 

 

Exterior;

 

  1. Prep subgrade for installation of 56’x56’x4” thickened edge reinforced concrete slab.  Remove top 4” of topsoil and install 4” sand cushion.  Removed topsoil to be used to blend slab perimeter.  Coordinate on-site meeting with Owner to establish final layout, elevation, and correct grade sloping at ½%.  See site plan for location and sloping.
  2. Form and place reinforced concrete slab. 56’ x 56’ x 4” thickness with 6” thick 12” perimeter.  Perimeter shall be reinforced with 2 rows of #4 rebar.  Install 6×6 w.w.f.  Floor slab finish to be smooth.
  3. After concrete placement, contractor to saw cut control joints (14’x14’ grid pattern).  Provide and install concrete cure and seal compound.  Remove formwork and place topsoil blending in the concrete perimeter.  Leave with raked finish.  Owner to seed.  Excess topsoil material may be relocated on site by placing it to the South end of the site, blending in with hillside.

 

Bid Alternate #1: None

 

 

Specified Product Substitutions:  All proposed product substitutions must be approved by the Project Coordinator 5 days prior to bid.  Any approved substitutions, will be made available to all bidders.

 

Contacts:

Interested bidders shall contact Ryan Jendro – CMD Project Manager at ryan.jendro@millelacsband.com or at 320.532.7857 to be included on the bidder’s list in the event that any addendums are issued for this project.

 

Mobilization:

  1. The Contractor shall be capable of mobilizing his equipment and crews within seven days of the receipt of Notice to Proceed.
  2. Contractor shall provide means and methods for all building phases of construction.

 

COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON.

 

COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES.

 

Bidding notes:

  1. Submit proposal in lump sum (supply and install), not to exceed amount
  2. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements.
  3. All Contractors must provide the following along with their bid submittal:
    1. Completed and signed MLB Community Development Construction Bid Form
    2. A copy of Current MLB Vendor’s License (or a copy of the submitted application)
    3. A copy of Current Insurance Certificate
    4. A copy of Subcontractor/Material Supplier list
    5. A copy of  valid State of Minnesota Contractor’s License
    6. A copy of Authorized Signature Sheet (submitted with first bid submittal)
  4. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA § 5). Contact Craig Hansen at (320) 532-4778.

 

All proposals must be mailed and labeled as follows:

 

Mille Lacs Band of Ojibwe

Commissioner of Community Development

Sealed bid: (D2 Pow Wow Concrete)

PO Box 509

Onamia, MN 56359

 

**Please note that the bids submitted via mail to the P.O. Box. FedEx and UPS will not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items. Please plan accordingly to ensure the timely receipt of your bid submittal. Do not require delivery signature.**

 

PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED.

 

Licensing:

  1. Firms must be licensed with the Mille Lacs Band of Ojibwe.  A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Jacquelyn Smith at (320)532-8240 or email at jsmith@mlcorporateventures.com with questions regarding licensing and for the license application.

 

 

PERMIT AND CONTRACTOR REQUIREMENTS:

Permits:  Contractors are responsible to attain all necessary permits for all work, including Mille Lacs Band of Ojibwe (MLBO) Permit.

 

Bonding Requirements:  In accordance with 2016 MLB Project Specification Book.  Please note that bonding requirements on Mille Lacs Band Funded Residential projects has changed.  All projects over $50,000 require bonding regardless of company ownership.

 

MLBSA Section 17 Procurement Statue Ordinance 03-06 states the following:

 

Section 17. Bonding

 

  1. In construction contracts that are federally funded or deemed commercial, bonding is required.  These types of contracts shall demand a performance bond not less than twenty (20%) percent of the total contract price, but not to exceed $500,000.00.  A performance bond requirement is to ensure that, if a contractor defaults, the Band may request that the surety pay the expense incurred to complete the construction contract.

 

  1. In addition, all construction contracts identified as federally funded or commercial shall be covered by a payment bond equal to one payment installment or cover subcontractors/suppliers as determined by the Contracting Officer or his agents.  The payment bond must contain language stating that if the contractor fails to make a payment to its subcontractors/suppliers, the surety will make the necessary payment.

 

 

 

SECTION II – BIDDING FORMS

Bidding Requirements and Contract Forms

COMMUNITY DEVELOPMENT

PROJECT MANAGEMENT

 

 

FY 2016 CONSTRUCTION BID FORM

REQUIRED FOR ALL BIDS

 

 

FIRM NAME: __________________________________________________________________________

 

JOB/PROJECT:  D2 Pow Wow Concrete 37736 Hwy. 65, McGregor, MN.

 

LUMP SUM PRICE:

 

__________________________________________________________________$____________________

(Written Value)                                                                                               (Dollar Amount)

 

ALTERNATE #1: (Description)

 

__________________________________________________________________$____________________

(Written Value)                                                                                                 (Dollar Amount)

 

ALTERNATE #2 (Description):

 

__________________________________________________________________$____________________

(Written Value)                                                                                                 (Dollar Amount)

 

 

Acknowledgement of Addendum(s): 1) __________ date    2) ___________date   3) ___________date

 

 

 

BID GUARANTEE PERIOD:

I agree to hold this bid open for a period of 90 days after the bid opening.  If this bid is accepted I agree to execute a Contract and/or a Purchase Order with the Mille Lacs Band of Ojibwe along with furnishing all required bonding (if required) and insurances.

 

TERO COMPLIANCE:

I understand that this company, its subcontractors and all employees performing work on this project will be expected to comply with all Mille Lacs Band TERO Compliance Regulations. Upon being informed that I will be awarded a contract for this project, I will submit all required TERO Compliance Plans directly to the MLB TERO Office for review and approval.

 

Acknowledgement of TERO Compliance:  _________________________

 

 

ATTACHMENTS REQUIRED:  Failure to provide any of these attachments will result in bid disqualification.

  • MLB BID FORM (MUST BE SIGNED)
  • MLBO VENDOR LICENSE
  • COPY OF CURRENT INSURANCES
  • COPY OF MINNESOTA CONTRACTOR’S LICENSE
  • SUB-CONTRACTOR LISTS (Include values)

 

 

 

NAME: ________________________________________TITLE:________________________

 

SIGNATURE: _______________________________________DATE:____________________

 

FIRM NAME: ________________________________TELEPHONE:_____________________

 

ADDRESS: ____________________________________________________________________

 

EMAIL ADDRESS: ____________________________________________________________